Case Study

First HT30 Max core barrel system run saved 1.5 days rig time and delivered excellent core quality

First HT30 Max core barrel system run saved 1.5 days rig time and delivered excellent core quality

Pages 1 Pages

First HT30 Max core barrel system run saved 1.5 days rig time and delivered excellent core quality Results • Recovered 270 ft (82 m) of core in one run • 100% core recovery • 100% barrel efficiency • Provided excellent core quality • Improved ROP 150% • Saved an additional core run through longer barrel setup • Saved 1.5 days rig time Challenges • Acquire the core in as few runs as possible • 4 in. core required in combination with JamBuster technology in 81/2 in. hole section • Limestone interbedded with anhydrite BHGE solution • HT30 Max core barrel system • JamBuster core jam mitigation system • Talon Core coring bit • Non-rotating inner tube stabilizers • Universal wellsite kit equipment Baker Hughes, a GE company (BHGE), was approached by an internati

Join for free to read