Case Study

First Ever Implementation Of Availability Based Tariff (ABT) Energy Management System (EMS) For A Power Generating Plant In India

First Ever Implementation Of Availability Based Tariff (ABT) Energy Management System (EMS) For A Power Generating Plant In India

Pages 3 Pages

FIRST EVER IMPLEMENTATION OF AVAILABILITY BASED TARIFF (ABT) ENERGY MANAGEMENT SYSTEM (EMS) FOR A POWER GENERATING PLANT IN INDIA Business Need The Indian government instituted significant and definitive power sector reforms in 2003 (Electricity Act of 2003), to provide electricity at an affordable price and improve the quality of supply. Availability Based Tariff (ABT) was introduced as part of that legislation, as a mechanism to enforce