Case Study
First Electrical Resistance Heating (Erh) “Hot Floor” Remediation Strategy
For further information: TERRATHERM, inc. 151 Suffolk Lane Gardner, MA 01440 (978) 730-1200 info@terratherm.com www.terratherm.com First Electrical Resistance Heating (ERH) “Hot Floor” Remediation Strategy U.S. Navy, Site 89, Camp Lejeune, NC Approach: • Electrical Resistance Heating • Target Treatment Zone (TTZ): ? Area = 15,900 ft 2 (10,500 m2 ) ? Volume = 130,000 cy (10,000 m3 ) ? Depth = 5-26 ft (1.5-8 m) bgs • 91 Electrodes ? 43 d