Case Study

Fire Engineering

Fire Engineering

Pages 2 Pages

Fire engineering y employing specialised fire engineering techniques on a Sydney CBD high-rise office refurbishment, the design team on 151 Clarence Street were able to save their Client, AMP , more than $1.6 million, making the refurbishment economically feasible. The refurbished building did not require passive fire protection material to be re-applied to the steel floor beams, which also s

Join for free to read