Case Study

Finnetunnel – Stabilisation of the tunnel mouth with POWERTHREAD GRP Bolts

Finnetunnel – Stabilisation of the tunnel mouth with POWERTHREAD GRP Bolts

Pages 1 Pages

Finnetunnel – Stabilisation of the tunnel mouth with POWERTHREAD GRP Bolts The Finnetunnel is part of the construction project “Verkehrsprojekt Deutsche Einheit Nr. 8 Ausbau-/Neubaus- trecke Nürnberg - Erfurt - Leipzig/Halle - Berlin“ (traffic project German Reunion No. 8 Extension/Renewal of the railway Nuremberg - Erfurt - Leipzig/Halle - Berlin) comprising the new construction of two single-track tunnels of 6,970 m length and 9.6 m d

Join for free to read