Finally, The Ideal Retrofit For This Hotel
Finally, the ideal retrofit for this hotel. case study WHAT THE CLIENT NEEDED When the north tower of this major convention center hotel was built in 1984, its 681 rooms and 25 floors got their hot water from two 3000 MBH copper fin water heaters and a massive 7000 gallon tank. After 15 years, the tank was severely leaking, replaced with two gas-fired 2800 MBH, 1500-gallon storage tank heaters. The retrofit required a crane to haul the o