Fibrelite Trench Covers Chosen for High Profile Substation Rebuild after Hurricane Sandy Destruction

Fibrelite Trench Covers Chosen for High Profile Substation Rebuild after Hurricane Sandy Destruction

Pages 1 Pages

High Pro le Substation Rebuild Fibrelite Trench Covers Chosen for High Pro le Substation Rebuild after Hurricane Sandy Destruction Fibrelite Trench Covers Can Withstand Heavy Loads Fibrelite Trench Covers Can Withstand Heavy Loads Fibrelite’s HS-20 load rated composite trench covers have been selected by one of the nation’s largest metropolitan electrical utilities for a high pro le rebuild of a 345 kV bulk power substation. The substation is located in a low-lying coastal area that was subjected to severe ooding caused by Hurricane Sandy in 2012. The substation was ooded due to the hurricane’s strong winds and subsequent storm causing signi cant damage to critical power transmission equipment and forcing the utility to take it o ine during the storm. As part of the utilities’ e orts