Case Study

Felindre 66” Mains

Felindre 66” Mains

Felindre 66” Mains Site Loca on: >> Felindre Water Treatment Works, Swansea Client: >> Dwr Cymru Welsh Water Contract Value: >> £392,601.00 Project Dura on: >> 31 Weeks Overview: Welsh Water had iden ?ed a leak of their 66” dia outlet water main from the treatment works. Our scope of work was to sink a sheet piled co ?erdam and excavate and expose the twin 66” mains at the iden ?ed leak posi on. The leaking main was then to be repaired us

Join for free to read