Case Study
Felindre 66” Mains
Felindre 66” Mains Site Loca on: >> Felindre Water Treatment Works, Swansea Client: >> Dwr Cymru Welsh Water Contract Value: >> £392,601.00 Project Dura on: >> 31 Weeks Overview: Welsh Water had iden ?ed a leak of their 66” dia outlet water main from the treatment works. Our scope of work was to sink a sheet piled co ?erdam and excavate and expose the twin 66” mains at the iden ?ed leak posi on. The leaking main was then to be repaired us