Fawley-Marchwood-Nursling, Hampshire
Our client was undertaking refurbishment works along the above overhead line (OHL), which ran from Fawley Power Station to Marchwood and Nursling substations to the east of Southampton Water. It comprised 70 towers over approximately 20km spanning various geological strata. CGL was appointed to undertake a geotechnical desk study and walkover survey of the above OHL and provide a preliminary geotechnical risk rating for each tower formi