Case Study
Fan Manufacturer Saves Energy, Increases Production with Munters’ Z-Duct Heat Exchanger
Munters Corporation, Air Treatment Division Phone +1 800 843 5360 / Email dhinfo@munters.com / munters.us Quick facts By installing the Z-Duct heat exchanger, the fan manufacturer has achieved: • Over 60% energy savings • An average 25% production increase • Less than one year payback • Easy maintenance and reduced costs Case study: Air Treatment Powder Coating for Fan Manufacturer Fan Manufacturer Saves Energy, Increases Production with Mun