Case Study
Factory
www.selsports.co.uk THE SCHEME The Client wanted to a social / recreational area on the top floor, level 17 to take advantage of the breathtaking London backdrop, one of the most impressive skylines in the world. One of this buildings unique features. THE SOLUTION Installing a synthetic grass system on level 17 presented some serious logistical issues for getting materials to such a high level with limited access. Our solution was to reduce the r