Case Study

FACILITY PREPARES FOR PLANT EXPANSION WITH CDOX

FACILITY PREPARES FOR PLANT EXPANSION WITH CDOX

Pages 2 Pages

FACILITY PREPARES FOR PLANT EXPANSION WITH CDOX PARKVILLE WATER TREATMENT PLANT INTRODUCTION In the process of planning a plant expansion project, facility managers at Missouri American Water partnered with design consultants at Black & Veatch to select and install a carbon dioxide dissolution system capable of treating the plant’s current flow rate of 3.1 million gallons per day, while also preparing the facility for its future f

Join for free to read