Case Study

Fabrication Of Frame 7B Diffuser Assembly

Fabrication Of Frame 7B Diffuser Assembly

CASE STUDY Mar. 2015 - Sep. 2015 Universal AET 1 FABRICATION OF FRAME 7B DIFFUSER ASSEMBLY 11739 M68/33 ONAWAY, MI MORANIRON.COM 989.733.201111739 M68/33 ONAWAY, MI MORANIRON.COM 989.733.2011 2 WEIGHT 10,000 lbs Moran Iron Works was awarded a contract to fabricate a replacement diffuser assembly for install at Universal AET’s customer. This unit was fabricated using 304H, high carbon stainless steel, for durability in the extreme heat

Join for free to read