Case Study

F Fieldbus Solves Modbus Measurement Application on Hydropower Dam

F Fieldbus Solves Modbus Measurement Application on Hydropower Dam

Pages 2 Pages

© 2006 Rosemount Inc. All rights reserved For more information: www.rosemount.com POWER FOUNDATION TM Fieldbus Solves Modbus ® Measurement Application on Hydropower Dam ROSEMOUNT 3420 A technician who had never before seen a Rosemount 3420 completed the setup in 20 minutes. RESULTS • $4,150 savings at installation • Setup completed in 20 minutes • Flawless startup APPLICATION Modbus pressure transmitters desired for a small project at a hydropower dam site. CUSTOMER Small hydropower dam CHALLENGE Budget restraints required the project cost to be kept at a very low level. Another challenge was that local technical support was limited at this remote reservoir. The installation and start-up had to be made by the customer’s technician who had no time to spend on individual supplier’

Join for free to read