Extreme-Reach Tandem HydroPull™ Run on Jointed Pipe in the Bakken Shale
Case History: HydroPull™ Extreme-Reach Tandem HydroPull™ Run on Jointed Pipe in the Bakken Shale This job in the Bakken-Three Forks of North Dakota involved drilling composite bridge plugs in 4 1/2-in. (114 mm) casing from 9,855 ft. to 20,499 ft. (3,004 to 6,248 m) MD using a workover rig and jointed pipe with rotation. The wellbore’s horizontal section was extremely tortuous, and it was not possible to reach TD after 9 days of operation with a