Case Study
ExtendLift Gas Lift Relocation System Restored Lost Production in Vietnam Well
Case History An operator’s offshore well in Vietnam went off production. This was due to the original completion’s inef? cient conventional gas lift system. Estimated remaining reserves did not justify a costly workover, so the operator’s well required an innovative thru-tubing system. The operator approached Baker Hughes for a solution. Baker Hughes air freighted the innovatively designed and engineered capillary-mini-coil unit to Vietn