Case Study

Expensive Leaky Valve Maintenance Eliminated by Replacing Radiant Panels With Therma-Fuser VAV

Expensive Leaky Valve Maintenance Eliminated by Replacing Radiant Panels With Therma-Fuser VAV

Pages 2 Pages

FORM 80.37/601 Expensive Leaky Valve Maintenance Eliminated by Replacing Radiant Panels with Therma-Fuser ™ V AV Five Points Plaza Building The cost was within the budget and the operating and maintenance costs are meeting all expectations. The building is now 100% occupied and the tenants are happy. ATLANTA, Georgia—Leak- ing radiant panel valves had become an expensive maintenance problem for the Five Points Plaza build- ing. Re

Join for free to read