Case Study

Expanding San Francisco BART from Warm Springs to Berryessa

Expanding San Francisco BART from Warm Springs to Berryessa

Expanding San Francisco BART from Warm Springs to Berryessa Staying on schedule as plans change requires great project management skills. San Francisco’s 10-mile Warm Springs Extension project was a collaboration between LTK and three partners. LTK performed complex systems engineering on a Fast Track schedule, including design and communication systems. The systems engineering included more than 560 integrated design elements, all requiring coordination with civil/structural infrastructure and track design. The project team included LTK veteran engineers from our Seattle, Portland, Denver, Ambler, PA, and Boston offices. To cover the logistics of three time zones, and the complexities of 10 miles of grade level track, aerial track structures, and deep trench track segments, LTK assembled

Join for free to read