GREEN TECHNOLOGY SERVICES EXHAUST GAS SCRUBBER TOWER INSTALLATION FOR CRUISE SHIP IN 18 DAYS 3D LASER SCANNING, FEASIBILITY STUDY, DETAILED DESIGN ENGINEERING, PRE - FABRICATION AND INSTALLATION OF 2 EXHAUST GAS SCRUBBER TOWERS Goltens was engaged by a large cruise vessel owner to undertake the installation of 2 exhaust gas scrubbers on one of their cruise ships to comply with Sulphur Emissions regulations. The vessel is equipped with 4 GMT/Sulzer 16ZAV40S and two GMT/Sulzer 12ZAV40S diesel electric generating sets. The scope of the project was to perform all evaluation, planning, design and installation for two 10+ meter long exhaust gas scrubber towers on Diesel Generator #1 and #2 and complete the entire operation before the completion of its