Case Study
ExCeL Exhibition Centre Extension
www.severeld.com ExCeL Exhibition Centre Extension Location: London Client: ExCeL Main Contractor: Sir Robert McAlpine Engineer: McAlpine Design Group Architect: Grimshaws Tonnage: 8,000 Completion Date: 06/17/2009 Project Overview: The Phase 2 development at ExCeL London increased the venue event space by 50% and has secured its position as London's premier international exhibition and convention centre. The extension includes a brand new 5,000