Excavation Project Kept On Track With 210,000 Litre Storage System

Excavation Project Kept On Track With 210,000 Litre Storage System

Pages 1 Pages

Excavation Project Kept On Track With 210,000 Litre Storage System TANKS • FILTRATION • SPILLGUARDS +44 (0) 845 900 2841 rainforrent.co.uk PEACE STREET, BRADFORD, BD4 8UF BACKGROUND ACS Construction, a building and civil engineering contractor, was assigned to provide a safe excavation around a high pressure gas pipeline at the National Grid Partington AGI (Above Ground Installation). The system originally in place to handle the 6,000 litres/hour of hydrocarbon-contaminated water proved inefficient. Two 30,000 litre road barrels were not draining in a timely manner, and brought the project to a stop. OUTCOME Rain for Rent was called to replace the old system and provided three 70 m 3 storage tanks. Rain for Rent and Mantank, an environmental services company, partnered to empty th