Rubicon West EvoEnergy was asked to install two solar PV systems for the real estate management ?rm Rubicon West at one of its o?ce and retail complexes in Wigmore in Luton. Consisting of 291 panels and seven inverters, the combined 69 kWp array was the ?rst project to be ?tted by the EvoEnergy team using the Conergy roof hook mounting system; a pre-assembled system which reduces install time considerably. The team rose to the challenge, completing all mechanical elements a week ahead of schedule. The whole system itself, including a complex electrical BOS installation to link the two arrays, was completed in just three weeks. Because the panels were installed above shops, o?ces, a library and a health centre, the on site project manager made sure that all the tenants were kept well inform