Case Study
ETA Factory Of The TU Darmstadt
O K AS O L A R | O K ALUX HP I – R eferences DE ? E T A F actory of the T U Darmstadt After less than two years of construction, the E T A-F actory on the campus of the “T echnische Universität (T U ) D a r m s t a d t ” was completed in M arch 2016. T he research project, which spans several disciplines, interconnects the energy flow derived from the operation of the building, the building technology and production, demonstrating new energy savi