Case Study

“ Estimated time saved on the project will have been approximately one month”

“ Estimated time saved on the project will have been approximately one month”

Pages 2 Pages

K-Form Case Study Industrial hard standing, Essex “ Estimated time saved on the project will have been approximately one month” Project: Industrial Park Product: K-Form K135 Location: Essex Contractor: JK Construction (East Anglia) Ltd. Sub-contractor: Hos (Civils) Ltd30 Sturmi Way, Pyle, Bridgend CF33 6BZ T el: 01656 746071 | www.kform.co.uk | enquiries@kform.co.uk The project This site was previously used for manufacturing and storing precast concrete products. The defective concrete products were disposed of on the site. When JK Construction moved on to the site, they spent over 6 weeks preparing the site to a suitable condition for works to take place. The client plans to rent out the area for industrial storage. The solution The net concrete area required = 9,