ESPRIT Arena Düsseldorf, Germany
ESPRIT Arena Düsseldorf, Germany After a construction period of 2 years the ESPRIT (former LTU) Arena Düsseldorf, one of Europe’s most modern multi-purpose stadiums, was opened in January 2005. Beside concerts and mega sport events the ESPRIT Arena can be used for any other kind of events from 20.000 visitors up. Interesting Facts Location Düsseldorf, Germany Number of Nodes 40 CEA-709 infrastructure devices 270 CEA-709 meters 630 CEA-709 nodes for lighting and shading 1100 CEA-709 controllers for heating/cooling system Topology FIO Ethernet Backbone as far as the control cabinet. There the routing between the IP- 852 channel and the ANSI/EIA-709 channel is done by L-IP routers. The L-Switch is used where routing from a TP/XF-1250 channel to up to four parallel TP/FT-10 channels is pos