Case Study
ESPCP System Increased Run Life 433% in Congo
Case History Baker Hughes was approached by the operator of a problem well located offshore Pointe Noire, Congo. The well was experiencing a mean time between failure rate of 90 days with a rod-driven progressing cavity pump (RDPCP ™ ). The operator initially selected PCP technology due to the challenging environment of aggressive sediment that could not be handled by other forms of arti? cial lift. However, this particular well was dr