Case Study
ESP System Quadrupled Production for West Texas Operator
Case History An operator in the Permian Basin area of West Texas approached Baker Hughes for an arti? cial lift solution to increase oil production. This operator used a jet pump on the well for more than 10 years. The jet pump’s production was about 1,600 BWPD and 50 BOPD. Because the well experienced infrequent interventions, the operator was reluctant to install an electrical submersible pumping (ESP) system. Restrictions by the Env