ESeal Liner Restores Casing’s Pressure Integrity

ESeal Liner Restores Casing’s Pressure Integrity

Pages 1 Pages

ESealTM Liner Restores Casing’s Pressure Integrity Challenge During the primary cement job in a horizontal Marcellus well, a 5-ft. split developed in the 5-1/2 in. casing (just above the top of cement). Before the Operator could continue completing the well, the casing’s pressure integrity needed to be restored in order for it to withstand the upcoming multistage hydraulic fracturing operation (pressures to 9500 psi). Other solutions were investigated; however, none offered the pressure rating to work with a 5-ft. split and provide the pass-through ID required and be procured quickly. Added Value The ESeal Liner provided a timely solution to get the well producing while minimizing non-productive time. Overcoming the