Case Study

ESeal HP Patch Covers Squeeze Perforations; Enabling Planned Frac Operations

ESeal HP Patch Covers Squeeze Perforations; Enabling Planned Frac Operations

Pages 1 Pages

Enventure Global Technology 15995 North Barkers Landing, Suite 350 | Houston, Texas 77079 Tel 281.552.2200 | Fax 281.552.2201 | www.EnventureGT.com ©2018 Enventure Global Technology Enventure and SET are trademarks of Enventure Global Technology All Rights Reserved. Ver01 02/18 PERFORMANCE ESeal TM HP Patch Covers Squeeze Perforations; Enabling Planned Frac Operations Challenge An operator in the Anadarko Basin was running their 5-1/2 in. production string in a horizontal, unconventional shale well when they were unable to get cement to the top of the curve. They decided to perforate above the curve and squeeze cement down the annulus of the 5-1/2” production string. The Operator needed to be able to frac the entire horizontal interval with their planned plug and perf

Join for free to read