Case Study
ERTMS National Integration Facility Project Engineering and Safety Case
© Copyright Vertex Systems Engineering. All rights reserved. CASE STUDY CASE STUDY #2 ERTMS National Integration Facility Project Engineering and Safety Case Overview of deliverables Vertex was requested to assist Network Rail in the provision of a Safety Case and Hazard assessment for the demonstration site for ERTMS equipment (both trackside and train borne) known as the ERTMS National Integration Facility (ENIF). The project was required to deliver its outputs and gain safety approval within challenging timescales in order to meet a commitment for the rapid commencement of ERTMS testing, prior to roll-out of ERTMS for large-scale in service applications. Deliverables included: • Project Safety Engineering, including production of Safety Plan and Strategy; • Verification