Case Study

Erha North Phase 2

Erha North Phase 2

Pages 2 Pages

Erha North Phase 2 Client: Exxon Exploration and Production Nigeria Limited Location: Nigeria Project type: SURF and Topsides seabed-to-surface The Erha North Phase 2 development is an extension of the existing Erha subsea system and infrastructure, currently producing to the existing Erha FPSO located in OML 133 in Nigerian waters. All new subsea wells will be clustered into four new drill centres connected to existing subsea facili

Join for free to read