unprotected concrete frame building. Works included preparation, and concrete repairs using Sika’ s Monotop, and Ferrogard systems. Cemplas applied in excess of 1000m 2 of Monotop levelling coat to all concrete beams, columns, and frame of the structure. The repaired area were further protected by the application of Sika’ s 680S anti- carbonation coating. As the Principal Contractor, Cemplas also supervised additional sub-contract works includin