Case Study

Environmental Impact Statement Analyzes Vital US Highway Improvements

Environmental Impact Statement Analyzes Vital US Highway Improvements

Pages 9 Pages

Environmental Impact Statement Analyzes Vital US Highway Improvements Project KLJ was contracted by the North Dakota Department of Transportation (NDDOT) to conduct the environmental review process for the US Highway 85 Project. Services performed include preparation of an Environmental Impact Statement (EIS), preliminary engineering, survey, public and agency coordination, and several environmental field studies. The project encompasses approximately 62 miles of roadway and would expand US Highway 85 from a two-lane highway to a four-lane highway with flexible design options to avoid or minimize impacts. In addition, the project would rehabilitate or replace the historic Long X Bridge over the Little Missouri River. The project corridor traverses the Little Missouri River Badlands and Li

Join for free to read