Ensco 71 Living Quarters
www.optimusaberdeen.com T+44 (0)1224 264500 Ensco 71 Living Quarters Background Rigfit Offshore Ltd was appointed by Ensco Plc to design and install an upgrade to the existing living quarters on the Ensco 71 drilling jack-up rig. The upgrade was required to increase the PoB limit of the platform and meet the accommodation standards to operate in the Danish sector of the North Sea. Optimus were awarded the structural engineering