Case Study
Enlow Fork Coal Mine, East Finley, PA
www.aerixindustries.com 303-271-1773 info@aerixindustries.com 5902 McIntyre St. Golden, CO 80403 USA AquaeriX TM Mine Slope Roof Water Control Project spotlight A 2,500 foot long decline tunnel was constructed at the Enlow Fork Coal Mine to deliver supplies into the mine and carry coal out via a belt conveyor system. Water in?ow at the interface between the end of the concrete tunnel liner and the shotcrete tunnel liner had the potential to