Engine Company 1 Temporary Facility Washington, DC The Challenge Part of a multi-million dollar development project throughout Washington DC, modular construction was chosen to build a two-story 7,300 sqft temporary fire house, taking advantage of the fast modular concurrent construction process that en- abled a rapid completion date. The design needed to be 100% relocatable in order to be relocated to another project after five years. Marginal site disturbance and minimal material laydown was required, with very little space available working on a very tight site. The Solution The temporary fire house located in Washington, DC, includes many work areas. The kitchen s equipped with built in cabinets, appliances, double sinks, and coffee station; Officer Bunks provide a quiet retr