— CASE STUDY Energy producer in US heartland enlists ABB to uncover and solve issues before they become problems ABB AbilityTM Performance Optimization for control systems – Harmony can identify multiple areas of potential failure in energy company’s Harmony control system so engineers can fix them before they fail — 01 A 250 MW emergency reserve power plant with ABB control systems Issues just waiting to be found To maintain its operations at peak performance, a major electricity and natural gas supplier with 2 million customers in the US heartland needed easier access to control system log and trend data so they could take remedial action more quickly, and improve performance by tracking Key Performance Indicators (KPIs) over time. Although the company’s control syste