Case Study
Energy efficient installation at The Royal Hospital Chelsea
Energy efficient installation at The Royal Hospital Chelsea “...the installation at The Royal Hospital gave us the opportunity to improve the heating system to benefit the 300 In Pensioners living within the 2 residential wings on the site” Stephen Moore, Managing Director at FIN Engineering www.bosch-industrial.co.uk Owners of listed buildings across the UK are often faced with a number of challenges associated with maintenance. The Grade I list