Case Study
Energy efficiency and conservation are top priority of the school district.
NUDURA Project Profile 866-468-6299 www.nudura.com FAST FACTS Alvaton Elementary - Bowling Green, Kentucky USA • Energy efficiency and conservation are top priority of the school district. As a result, numerous building systems and sustainable architecture concepts were evaluated and incorporated in the school. • These include: - Sandwich panel metal roof system, achieving an R-30 insulation value - Geothermal heat pump system - Lighting and HVAC occupancy sensors. - Green building finishes - Natural day lighting. • Two story K – Grade 5 elementary school with upper and lower class- room wings totaling 77,000 sq. ft. This project utilized NUDURA ® 12” on the gymnasium and 8” Forms on the core area of the building. PROJECT STATISTICS Location: Bowling Green, Kentucky USA Type: E