Case Study
Energy & cost saving installation upgrades - Luton Airport High Mast Upgrade
Energy & cost saving installation upgrades Project Facts Client Name Luton Airport & Midstream Location Luton, Bedfordshire United kingdom Dates 2018 Working closely with Midstream atg airports installed a new apron lighting system using the existing masts which would comply with the EASA requirements for Apron Floodlighting. Case Study | Luton Airport High Mast Upgrade LED technology for high mast lighting is a new development in the field of solid state lighting (SSL). The challenges of delivering products with very high power and advanced thermal management properties, at a cost that is economically viable, has been the focus of Midstream from the very start. High power lights generate a significant amount of heat which can damage the LEDs and reduce life-time and perform