Case Study

Energia Costa Azul LNG Terminal

Energia Costa Azul LNG Terminal

Pages 1 Pages

To meet shrinking supply of domestic natural gas, Sempra Energy International developed the first liquefied natural gas (LNG) receiving terminal on the Western Coast of North America. The $1 billion port and processing facility is located on a 100-acres site along rugged coastline. The facility offloads LNG to two large storage tanks, converts it back to gas, and transports the gas via pipeline to the southwestern U.S. CHALLENGING OFFSHORE AN

Join for free to read