Case Study
ENECON Partners With Local Mechanical Engineering Company To Repair & Protect Cooling Tower
This 25 year old cooling tower located in downtown Seattle was built inside a structure with steel beams and a roof above it making it a very difficult candidate for replacement without involving major structural demolition and rebuilding. The local ENECON Field Engineering Specialist was contacted to help find an affordable solution that would provide a minimum of 9-10 years life extension to the cooling tower. The interior of this