PROJECT PROFILE D’Appolonia performed a numerical analysis and Value Engineering (VE) assessment of a stabilization plan for the Emsworth Main Channel Dam Left Abutment Wall for the U.S. Army Corps of Engineers (USACE). Because of the USACE plan to permanently lower the riverbed in front of the exist- ing left abutment wall by up to 30 feet as part of scour protection improve- ments below the dam apron, a stabiliza- tion system o