Emmenweid Hydropower Plant Rehabilitation Lucerne, Switzerland Project Description The Client determined that the gener- ating equipment first installed in 1933 and renewed in 1943 required reha- bilitating due to excessive downtime due to increasing component failure. From a lifetime cost analysis, various technical options were identified. The initial option by the Client to only re- place the turbine regulator was re- v