Case Study

Emergency Hospital

Emergency Hospital

Pages 1 Pages

Overview: Constructed in 2012, this system was designed to produce domestic hot water for the hospital as well as to help preheat the existing system. Consisting of 80 Apricus AP-30 Evacuated Tube Collectors, the collectors sit on top of the building, stretching across the roof. Designed to handle the building’s total hot water consumption, the system has one 5,000 liter tank, one 3,000 liter tank, pumps, pipes, heat exchangers, and a c

Join for free to read