Case Study

Embedded Pcs Process 40,000 Data Points On The Basel Nordtangente

Embedded Pcs Process 40,000 Data Points On The Basel Nordtangente

Pages 4 Pages

PC Control 01 | 2011 tunnels, a fundamental reassessment of the safety concepts took place in 2000. The tunnel ventilation requirements also had to be reworked after the introduction of catalytic converters and the reduction in exhaust emissions that occurred as a result. The ventilation concept, originally only conceived for normal operations, has been designed for event mode (operations in the event of incidents), and in the event of fire,

Join for free to read