Case Study
Eliminator Protection For Southampton’s Northam River Bridge
Eliminator protection for Southampton’s Northam River Bridge CLIENT: SOUTHAMPTON CITY COUNCIL CONSULTANT & MAIN CONTRACTOR: RAYMOND BROWN AUTHORISED CONTRACTOR: STIRLING LLOYD CONSTRUCTION, VOLKERLASER The Northam River Bridge was originally constructed in 1799 and operated as a toll road. It was replaced in 1889 with an Iron bridge and was replaced again in 1954 with a pre-stressed concrete bridge, making it the first major pre-stressed