Case Study

“Eliminating costly bearing failure”

“Eliminating costly bearing failure”

Pages 1 Pages

www.aesseal.com $40,000 a year saving with LabTecta® and minimal plant disruption A coal fired power plant in the USA, was having 3 - 4 bearing failures a year on their primary air fan, used to blow the coal from the mill to the boiler. For safety reasons the customer would inert the fan duct with steam to reduce the risk of a flash fire from the coal dust in the system. This safety procedure was causing water to get into the pillow bloc

Join for free to read