Case Study

Eliminate Workovers Due to “Sand Locking” Rod Pumps

Eliminate Workovers Due to “Sand Locking” Rod Pumps

Pages 4 Pages

JJ Tech 5220 Hollywood Avenue • Shreveport, LA 71109 • Phone: (318) 636-6893 • j-jtech.com Eliminate Workovers Due to “Sand Locking” Rod Pumps Problem: Operator can not produce well for more than 4-5 days due to leftover frac sand in wellbore. Solution: Install Reverse Flow HSP Jet Pump to bring frac sand to surface along with production. Results: Well remained on Jet Pump system 18 months, recovering 1-5 gallon

Join for free to read