Case Study

Elektrárny Opatovice Co-Generation Plant Optimizes Supply and Reduces Maintenance Costs with Rosemount Flowmeters

Elektrárny Opatovice Co-Generation Plant Optimizes Supply and Reduces Maintenance Costs with Rosemount Flowmeters

Pages 2 Pages

© 2015 Rosemount Inc. All rights reserved For more information: www.rosemount.com Elektrárny Opatovice Co-Generation Plant Optimizes Supply and Reduces Maintenance Costs with Rosemount Flowmeters RESULTS • 100% reliability in challenging conditions over two years of operation • 100% confidence and low uncertainty of performance testing • Reduction in system electricity consumption and maintenance costs APPLICATION High temperature and high pressure water flow measurement (170 °C & 25 bar) at heat energy transfer pipeline in a co-generation plant. CUSTOMER Elektrárny Opatovice (EOP) CHALLENGE Elektrárny Opatovice, a.s. (EOP), a coal fired co-generation power plant with achievable electrical output of 363 MWe and a total thermal capacity of 698 MWt, is one of the leading energy supplie

Join for free to read